Skip to main content

News

Annual meeting of the EUROSAI WGMA with the stress on infrastructure challenges

From 4 to 6 October 2024, there was the annual meeting of the EUROSAI Working Group on Municipality Audit (WGMA) held in Tbilisi, organised by Supreme audit institution of Georgia. 

The seminar in the first part of the meeting was dedicated to auditing of infrastructure projects in local communities with the purpose to highlight different practises. Some presented audits from the concerned field offered an opportunity for a discussion and exchange of experiences related to challenges and risks of auditing. At the meeting, two mayoresses and a mayor presented their points of view regarding the infrastructure challenges in their local communities. A lecture of the representative of the Ministry for regional development and infrastructure of Georgia gave an insight into criteria for allocating funds to the local communities.

The final part of the meeting was aimed at reviewing how the objectives of the 2024–2027 EUROSAI WGMA Strategy were achieved and how the results of the last year's activities were met. Also the Court of Audit of the Republic of Slovenia participated in fulfilling two of them, namely in collecting data on audit results from the field of transport and in designing new compendium. The participants proposed topics to be covered by on-line workshops and other planned activities for 2025.

The photo shows the conference room where the meeting of the EUROSAI Working Group on Local Self-Government (WGMA) is taking place. Participants from different countries sit on both sides of a long table, which is indicated by small flags on the tables. In the foreground is a speaker standing in front of a projection screen and presenting the content with the help of a map of Georgia. The lighting in the room is modern, with many hanging lights on the ceiling.